CLIENT // Etihad Airways PJSC
CONSTRUCTION COST //
SERVICES COMPLETION // On going
RW ARMSTRONG ROLE // Full Lead Design Consultancy Services including Construction Technical Supervision
DETAILS // Etihad Airways’ Technical Operations Centre (TOC) site location is adjacent to Terminal 3 of Abu Dhabi International Airport (ADIA)
The Technical Operation Centre shall have three distinct spaces (Gross Floor Area) and a staff car parking area area.
• External Pavement - Includes existing area. (Approximation 50,000M 50,000M2 )
• Hangar – (15,000M,000M2)
• Support Building – (7,07,000 M2)
• Landside Staff Car Parking (500 vehicles) & Reception Facility
The TOC is integral to the Etihad Airways long term growth plan, consolidates resources, supports new working practice, and maintain light aircraft maintenance capability.
The facility will be a 24 hour occupied facility with a mix of industrial and office based staff staff. A clear span hangar provides full flexibility for planned service check maintenance and unplanned casualty maintena nce with support functions located within the TOC.
Key measures for overall operational improvements are:
• Two wide bodied aircraft and / or narrow bodied aircraft optimum capacity
• One A380 aircraft and Narrow bodied aircraft
• 100% workshop capability for all service check inputs
• 98% inventory demands are satisfied