RW Armstrong ( RWA ), International Engineering Firm - project details



CLIENT // Supervision Committee for the Expansion of the Abu Dhabi International Airport (SCADIA)

CONSTRUCTION COST // $ 5 million
AED 18.25 million

SERVICES COMPLETION // 30-Jun-08

RW ARMSTRONG ROLE // Design and build basis with pre-engineered building (PEB) solution based on 30% design documents.

DETAILS // Construction of a new hangar for the purpose of storing and maintaining eight helicopters and support facilities

AL BATEEN AIRPORT – HELICOPTER HANGAR FOR POLICE AIR WING COMPLEX Abu Dhabi, United Arab Emirates

This project included the construction of a new temporary hangar for the purpose of storing and maintaining eight helicopters and support facilities such as new foundations, structural members, roofing, architectural finishes, HVAC, plumbing, fire suppression, electrical, IT and communications networks. The project was executed on a design and build basis with pre-engineered building (PEB) solution based on 30% design documents. The major project elements provided by RW Armstrong included:   
  • Topographic survey and mapping.
  • Geotechnical investigation.
  • Existing utilities and infrastructure survey.
  • Architectural and engineering services.
  • Design basis manual.
  • 30% Design drawings and specifications.
  • Tendering documents.
  • Tender review.
  • Contractor 60% and 100% design submittal review.
  • Resident engineering services.
  • Project closeout services.